- Elektrownia "Kozienice" S.A. (“Kozienice power plant) and Kopalnia LW "Bogdanka" S.A. (“Bogdanka” coal mine) conclude a long-term contract for the supply of coal for the new power block being constructed in Elektrownia "Kozienice" S.A. The agreement was concluded until the end of 2036.
- ENEA S.A. registered office in Poznań moves from Nowowiejskiego 11 str., to Górecka 1 str.
- Approval to KDPW (Central Securities Depository of Poland) and admission to trading 30,981,380 of ENEA S.A. B series „employee shares”.
- Debut of employee shares on the Giełda Papierów Wartościowych w Warszawie S.A. (Warsaw Stock Exchange).
- ENEA is a partner of the VI National Forum of the Management Boards of the WSE Listed Companies.
- ENEA S.A. acquires 100% of Windfarm Polska shares becoming the owner of a wind farm in Bardy. The wind farm will generate approximately 150 000MWh of electricity per year.
- "Kozienice" power plant changes its name to ENEA Wytwarzanie as a part of the integration project of Generation Area.
- A consortium of Polimex-Mostostal and Hitachi Power Europe wins the tender for the construction of a new power block No. 11 at ENEA Wytwarzanie.
- ENEA Operator receives a special award of the 15 edition of the National Competition Benefactor of the Year for the program "First Aid – premedical rescue".
- ENEA Wytwarzanie receives a certificate confirming the compliance of the implemented in the Company, Integrated Management System for Quality, Environmental, Occupational Safety and Health with the requirements of ISO 9001, ISO 14001, PN 18001 and OHSAS 18001 standards within generation, trading of electricity and generation, transmission and distribution of heat.
- The agreement on the rules for the implementation of the new structure of the ENEA Capital Group in the "generation" area is signed in Białystok.
- ENEA S.A. signs a Programme Agreement with five banks, setting conditions of Bond Issuance Programme of a total value up to PLN 4 billion. The program is intended to meet the investment needs of the Capital Group for the next 10 years.
- Signing of a Framework Agreement with PGNiG S.A., KGHM Polska Miedź S.A., PGE S.A. and Tauron Polska Energia S.A on a joint exploration and extraction of carbohydrates from shale.
- Listing of 556 603 ENEA S.A. employee shares.
- ENEA S.A., PGE S.A., KGHM Polska Miedź S.A. and Tauron Polska Energia S.A. signed a letter of intent aiming to establish arrangements for cooperation in the construction of the first Polish nuclear power plant.
- Signing by ENEA Wytwarzanie and a consortium of Hitachi Power Europe GmbH and Polimex - Mostostal S.A. a contract for the construction of a new power block in Świerże Górne (Kozienice district).
- Signing by ENEA S.A. and ENEA Wytwarzanie agreement, under which ENEA S.A. becomes the owner of 100% of ELKO Trading shares.
- Handing over of the construction site for the new power unit in Świerże Górne (Kozienice district) to the general contractor.
- ENEA S.A. concludes a Loan Agreement of PLN 950 million for 15 years with the European Investment Bank.
- ENEA S.A. provides an application ENEA IR for Investor Relations on the Android Tablet.
- The Supervisory Board of ENEA S.A. adopts a resolution to appoint with 1 January 2013 Mr Krzysztof Zamasz for the position of the President of the Management Board of ENEA S.A.
- Publication of the first-ever comprehensive Report of Corporate Social Responsibility of ENEA Capital Group in 2011.
- Creation of a holding managed by ENEA Wytwarzanie within the integration process of Generation Area.
- ENEA Capital Group is the winner of the 100 Percent Employee Volunteering Awards in the Debut category.
- Krzysztof Zamasz becomes a President of ENEA S.A. Management Board.